Construction Claims Monthly 1996 Annual Index
December 1996 - Volume 18 Number 12
- Contractor Failed To Give Adequate Notice Of Site Condition Differing Site Conditions-subsurface; No
- Owner Prevails In Progress Payment And Site Condition Disputes Differing Site Conditions-subsurface;
November 1996 - Volume 18 Number 11
- Claims Need Not Be Included In Termination Settlement Proposal Termination-convenience; Claims Admin
October 1996 - Volume 18 Number 10
September 1996 - Volume 18 Number 9
- Pay-when-paid Clause Did Not Shift Risk Of Owner Nonpayment Payment; Subcontractors; Condition Prece
August 1996 - Volume 18 Number 8
July 1996 - Volume 18 Number 7
- Adr Provision Upheld Despite Absence Of Standard Of Review Claims Administration; Architects And Eng
- Request For Deviation Results In Nonexcusable Delay Delay-nonexcusable; Plans And Specifications; Wa
- Contractor Responsible Despite Failure To Encourage Minority Subs Bids-responsibility; Subcontractor
June 1996 - Volume 18 Number 6
May 1996 - Volume 18 Number 5
- Liquidated Damages Did Not Limit Delay Liability Multiple Prime Contracts; Liquidated Damages; Indem
- Owner Can Be Liable For Withholding Superior Site Information Differing Site Conditions- Existing St
April 1996 - Volume 18 Number 4
March 1996 - Volume 18 Number 3
- Government Warrants Commercial Practicability Of Design Specs Plans And Specifications; Warranty-imp
February 1996 - Volume 18 Number 2
- General Conditions Were Not Incorporated Into Subcontract Incorporation By Reference; Subcontractors
January 1996 - Volume 18 Number 1